Edinburgh West page 11

Continuing work at Russell Road

Earlier photos of Russell Road on Edinburgh West page 8 or
P1 or P2 or P3 or P4 or P5 or P6 or P7 or P8 or P9 or P10 or back to Edinburgh (all)

Russell Rd 76
1280 x 720
281K
A surveyor stands at his tripod and peers through the darkness under the main railway lines leading to the west and north.
Russell Rd 77
1280 x 720
278K
A crane sits close to the north side of the bridge. The narrow space between the fences allows pedestrians and cyclists access between Roseburn and Dalry/Gorgie.
Russell Rd 79
1080 x 1080
275K
The crane, assisted by a worker (and a bulldozer) prepare to insert reinforcement into a deep hole drilled by the machine shown below. Concrete will be poured into the hole later creating piles to support the tramlines.
Russell Rd 78
1280 x 861
345K
The drill used for piling near the railway bridge.
Russell Rd 81
1280 x 723
247K
150 metres to the west another machine makes a lot of noise drilling beside the Post Office Sorting Office.

Short 12 second video of drilling for piling between the Post Office Sorting Office and the entrance ramp to the railway workshops

Russell Rd 82
1280 x 720
257K
Another shot showing the drilling and pile driving beside the north side of the railway bridges. It was reported that some work can only be done overnight which will mean local residents will be disturbed.
Russell Rd 83
1280 x 720
267K
A closer look at two of the giant drill bits.
Russell Rd 84
1280 x 856
310K
The crane hoists some machinery over the pedestrian walkway.
Russell Rd 85
1280 x 627
240K
The walkway has been moved to the opposite (west) side of the road. The red rubble has been partially cleared and the pavement cleaned.
Russell Rd 86
1280 x 720
291K
Looking along the repositioned walkway towards the north side of the railway bridges.
Russell Rd 96
1225 x 1080
358K
Somewhere near here trams will pass overhead one day. The cycle path which ran along the high embankment has been closed off but is still accessible a bit to the north at Wester Coates Terrace near Roseburn.
Russell Rd 2012 11
1280 x 720
275K
If approaching from the south the most obvious change is a temporary concrete shuttering wall on the east side of the road. 17th February 2012.
Russell Rd 2012 12
1280 x 723
300K
Zoomed in. The embankment at the back is where the cycle path has been closed off.
Russell Rd 2012 13
1280 x 720
255K
Behind the shuttering is a conduit space for drains and cables. It remains to be seen how the trams will traverse Russell Road.
Russell Rd 2012 14
1280 x 720
335K
On the opposite (west) side of the road facing south. A similar conduit space is being prepared here too. Don't expect to be able to drive through here for a while... People do try every day though, despited the ROAD CLOSED signs at Roseburn Street and Murieston!
Russell Rd 2012 15
1280 x 720
277K
The state of play on 3rd March
Russell Rd 2012 16
1280 x 816
358K
The sun shone on the 4th of March...
Russell Rd 2012 17
1280 x 720
348K
...but no concrete poured here just yet.

Russell Rd 2012 18
1280 x 720
249K

Normally lined with cars even when the road is closed.
Russell Rd 2012 20
1280 x 720
213K
Clearing the soil away from the railway embankment to make room. It's unclear how access to the railway workshops will be affected.
Russell Rd 2012 22
1280 x 720
287K
Once again, the pedestrian / cycle route has been changed to the east side where concrete has been poured and set into a high wall, replacing the old stone wall.
Russell Rd 2012 23
1280 x 720
259K
From the north east corner you can look back at the new wall over which trams will run.
Russell Rd 2012 24
1280 x 693
194K
Back at the west corner where the trams must somehow cross that ramp diagonally then run parallel to the Royal Mail sorting office on the right.
Russell Rd 2012 27
1080 x 1080
308K
A closer look at the new wall. The path under the rail bridge goes to McLeod Street and Murieston Crescent. These streets lead to Gorgie Road and Dalry Road respectively.
Russell Rd 2012 28
1280 x 682
259K
It now seems obvious that the trams will cross over the road slightly higher than the trains.
Russell Rd 2012 29
1080 x 1080
323K
The view in the opposite direction (north). The nearby signs state that the road is closed until summer 2012. Summer has come early at the end of March with record breaking temperatures thanks to global warming.
Russell Rd 2012 31
1280 x 720
441K
A new reinforced concrete ramp runs alongside the existing roadway into the Haymarket train workshops. I'm guessing it's for trams to run on - but how will they cross without blocking the original roadway?
Russell Rd 2012 32
1280 x 687
259K
A broad view of the scene. Reinforced plastic sheeting has been fixed to the embankment on the left. Two workers in hi-viz orange waistcoats are standing further up the cobbled roadway.
Murrayfield Stop
1280 x 639
247K
Not far to the west work continues beside Murrayfield stadium's main entrance. These steps must surely be for the tramstop being constructed. Thousands of fans will one day stream up and down this stairway.
Russell Rd 2012 33
1280 x 720
318K
If walking from Roseburn and staying on the right side of the road you'd see this facing the end of the footpath. The embankment has been stripped away to an angle and covered in this material.
Russell Rd 2012 34
1280 x 699
345K
There are also notices on fences saying KEEP AWAY FROM SIGNPOSTS. There aren't any signposts anywhere. Lots of notices but no signposts.
Russell Rd 2012 36
1280 x 720
325K
From the same corner as 33 above but looking to the left where this train siding curves towards the bridge over the road's other corner.
Russell Rd 2012 37
1280 x 707
279K
This is the rather rusty scene under this busy rail bridge. Corrugated iron provides some protection from pigeon shit.
Russell Rd 2012 39
1080 x 1080
259K
Back at the west-most corner where the orange crane prepares to lift a huge drill bit into the yellow drilling machine - or pile driver.
Russell Rd 2012 41
1280 x 720
277K
A closer view showing the diameter of the holes that are drilled then filled with welded reinforcing rods into which concrete is poured.
Russell Rd 2012 43
1280 x 827
483K
A drill bit but not the sort you'd fit into a power drill at home.
Russell Rd 2012 47
1280 x 1005
344K
At the north side of the railway bridge preparations continue for the tram bridge. May 3rd 2012.
Russell Rd 2012 48
1280 x 1080
373K
Zooming in shows a worker inside the concrete reinforcements, chipping some concrete away with a pneumatic drill. I'm reminded of a Tom Sharpe book in which a body, embedded in concrete, turned out to be an inflatable 'woman'.